yeah, right.
Stress and Frustration. I'm really starting to worry about the state of my stomach.
I was almost done with some batch records I was scrambling to get done and the client CHANGES things, so that EVERY SINGLE BATCH RECORD (7 of them) has to be changed.
Does this change their intended (impossible) dead line? NO, don't be silly.)